July 9, 2024 — Passed
14 red flags recorded · 60 minutes on site.
- The floor finish shall be smooth, durable, easily cleanable, and non-absorbent in all areas where there is food service or preparation, open food storage, warewashing, janitorial service, trash storage, and employee restrooms.
- Pressurized warm water shall be provided by all handwashing sinks for a minimum of 15 seconds through a mixing valve or combination faucet. At handwashing sinks where the water temperature provided is not readily adjustable at the faucets, warm water between 100°F-108°F shall be provided.
- All new and used equipment and utensils shall be certified or classified for sanitation by an American National Standards Institute (ANSI) accredited certification program, e.g. NSF, ETL Sanitation, UL Sanitation, CSA Sanitation.
- Wall and ceiling finish shall be smooth, durable, easily cleanable, and non-absorbent in all areas where there is food service or preparation, open food storage, warewashing, janitorial service, trash storage, and employee restrooms.
- All permanent food facilities that wash, rinse, soak, thaw, or similarly prepare foods shall be provided with a food preparation sink with a single integral drainboard. The food preparation sink shall have a minimum dimension of 18"x18"x12" (LxWxD) with an integral drainboard at least 18"x18" (LxW).
- The water supply shall be from a water system approved by the local enforcement agency.
- A permanent food facility shall provide clean toilet facilities in good repair for consumers, guests, or invitees when there is onsite consumption of foods or when the food facility was constructed after July 1, 1984, and has more than 20,000 square feet of floor space.
- All equipment shall be installed on castors, six (6) inch high round metal legs, or on a minimum four (4) inch high curb or pedestal with a continuously coved base at the juncture.
- Equipment that discharges liquid waste, e.g. food preparation sinks, dishwashing machines, steam tables, ice machines and bins, espresso machines, walk-in refrigeration units, shall have approved indirect drainage through an air gap into a floor sink or other approved receiving vessel.
- Floor surfaces shall be coved at the juncture of the floor and wall with a 3/8 inch minimum radius coving and shall extend up the wall at least 4 inches.
- Provide a 3-compartment sink with two integral metal drainboards for manually washing, rinsing, and sanitizing equipment and utensils.
- Hand sinks shall be sufficient in number and conveniently located so as to be accessible at all times.
- Equipment for holding cold food shall be sufficient in number and capacity to ensure proper food temperature control.
- At least one curbed cleaning facility or janitorial sink equipped with hot and cold water and a drain shall be provided and conveniently located.